12/13/10

NATSCA2 Final Project Instructions

For the final project, my class is expected to do a project with the following specifications:


1.) A 4-5 min AVP on one(1) of the following topics:

i. Metro-manila air quality
ii. Metro-manila water quality
iii. Metro-manila plastic pollution
iv. Climate change in metro-manila

2.) The project is to be individual
3.) All video clips and photos are to be original.
4.) Project is due on Dec 23, 12:oo MN.
5.) By the set deadline, a youtube link is expected as a comment to this post.

NATSCA2 fieldwork update

Just got word that the NATSCA2 field work for this term will be cancelled because of low turn-out. This means my class will meet on Monday Dec 20. This also means that we will be doing the metro-manila issues on air quality, water quality, plastic pollution and climate change for our finals.

12/5/10

Natsca2 Field Work

It's field work time once again. This term, we will be going to Mt.Malarayat and Brgy Hugom, San Juan, Batangas. The estimated cost is PHP3050 inclusive of transportation,accommodations and food. As soon as the go signal for CSB VP Academics is given, payments will be accepted until Dec 15. Details will be posted in the dropbox location for Field work.

If you intend to go, sign up here:

https://spreadsheets.google.com/viewform?formkey=dHZNZDJ4blNET043NWN0Q1pITHpQQVE6MQ


Make Money

  © Blogger template 'A Click Apart' by Ourblogtemplates.com 2008

Back to TOP